What We Do

Services

Every deck job we take on, from a full new build down to a handful of replacement boards.

HomeServices

Everything we take on

Every job below is one we do ourselves across Tustin.

Deck Installation

We frame new decks from the footings up, sizing posts and beams to the actual load the deck will carry, not just what looks right. Ledger boards get bolted and flashed properly where they meet the house, since that's the joint most decks eventually fail at. We'll walk you through wood or composite decking before we pour a single footing.

Deck Repair

A deck that feels bouncy usually means a joist has cracked or a beam is undersized, and we open it up to find out rather than guessing from the top. Loose railings, split stair stringers and rotted ledger boards all get fixed the same way, by replacing the actual failed member instead of patching over it. Some repairs take an afternoon, others mean rebuilding the frame under boards that still look fine.

Deck Staining & Sealing

Southern California sun bleaches and dries out wood faster than most people expect, and an unsealed deck can start splitting within a couple of years. We pressure wash, let the boards dry fully, then apply a penetrating stain or sealer rated for UV, not a surface coating that peels. Composite decking skips the staining, but we'll still clean and treat the fasteners and end caps.

Custom Deck Design

Some yards need a single flat platform, others need steps down to a lower patio or a bench built into the railing. We design around the slope of your yard, where the sun sits in the afternoon, and how many people you actually want standing out there at once. Anything over 30 inches off the ground gets a guardrail worked into the design from the start, not bolted on after the fact.

Composite Decking Installation

Composite boards like Trex or TimberTech don't rot or splinter, and they skip the yearly staining that wood decking calls for. We still frame the substructure in real lumber and use hidden fastener clips so the surface stays free of screw heads. Composite expands and contracts more than people think, so board spacing gets set for our summer heat, not a cool morning install.

Deck Railing Repair & Installation

A railing that wiggles is usually a post that's only screwed to the rim joist instead of bolted through with blocking behind it. We rebuild posts properly and set baluster spacing so a 4 inch sphere can't pass through, which is what most cities check on inspection. Cable rail, wood, and aluminum systems are all fair game.

Deck Resurfacing

If the frame underneath is still solid but the boards are cupped, gray, or full of splinters, we can strip the old decking and lay new boards over the existing structure. This costs less than a full rebuild and takes a fraction of the time, usually a day or two depending on square footage. We check every joist for soft spots before any new board goes down.

Deck Board Replacement

Sometimes it's just a handful of boards that took the worst of the sun or caught standing water, not the whole deck. We pull the damaged boards, check the joist underneath for rot, and match new decking as close as we can to the existing color and profile. It's the cheapest fix that holds up, when the rest of the deck is sound.

Deck Demolition & Removal

Old decks come down board by board so we can check the ledger and framing underneath for rot before anything new goes up. We haul away every scrap of old lumber, nails and all, so you're not left staring at a pile of debris. This is usually the first step before a rebuild, but we'll do standalone removals too.

Pergolas & Deck Covers

A lot of decks in this area need shade more than anything else, so we build pergolas and attached covers alongside the decking itself. We tie the posts into the same footing work as the deck so the structure moves as one, not two things fighting each other in an earthquake. Shade cloth, louvered covers, or open rafters, depending on how much sun you actually want blocked.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Tustin, CA

Deck installation and repair, available across these Orange County communities.

Tustin, CA
Anaheim, CA
Santa Ana, CA
Irvine, CA
Huntington Beach, CA
Garden Grove, CA
Fullerton, CA
Orange, CA
Costa Mesa, CA
Mission Viejo, CA
Newport Beach, CA
Yorba Linda, CA
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit for a new deck?
Most cities require a building permit for any deck attached to the house or more than 30 inches above grade, covering footings, framing and guardrail height. Freestanding, low decks under that height sometimes qualify for an exemption, but it's worth checking with the local building department before starting.
How long does a deck build take?
A straightforward ground-level deck typically takes one to two weeks from the first footing to the final board, weather and permit approval aside. Multi-level decks with stairs, built-in seating or a pergola can run three to four weeks.
Can you work within a set budget?
Deck material choice is the easiest lever to adjust to a budget, since pressure-treated pine costs a fraction of composite decking per square foot. Scaling the footprint, simplifying the railing design, or building a single level instead of multiple levels also brings a quote down.
What kind of guarantee do you offer on a deck?
Reputable deck contractors offer a workmanship warranty on framing and installation, typically one to a few years, separate from the manufacturer's warranty on the decking material itself. Composite decking brands often carry a 25 to 50 year warranty against fading and staining, which is worth reviewing before choosing a product.
Who will I actually be dealing with during the job?
On most deck jobs there's a single point of contact, usually the lead carpenter or crew lead, who handles day-to-day questions and any changes that come up on site. That's different from a general contractor setup where a project manager who never touches the tools is the go-between.
What decking material should I choose?
Pressure-treated pine costs the least upfront but requires yearly staining and typically lasts 10 to 15 years before boards need replacing. Cedar and redwood look better and resist rot naturally but still call for periodic sealing, while composite decking costs more initially but requires no staining and can last 25 years or longer.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during a deck build, though the immediate work area has to stay clear for safety and material staging. Expect some noise from saws and nail guns during work hours, and keep pets away from the site while framing and footing holes are open.
What do I need to do to prepare the site before work starts?
Clearing furniture, planters and grills off the existing deck or patio area is usually the homeowner's job before the crew arrives. Access to a power outlet and clear space for material delivery and a dumpster or debris pile also speeds up the job.
What if you find rot or damage once the old deck is torn out?
Hidden rot in the ledger board or rim joist is common once old decking comes off, especially where flashing was missing or installed wrong originally. Finding it mid-job usually means a change order to replace the damaged framing, which adds cost and a day or two but should never get skipped.
How do I take care of a new deck once it's built?
Wood decking calls for a fresh coat of sealer roughly every one to two years depending on sun exposure, along with keeping the surface swept and gaps clear of leaves and debris that trap moisture. Composite decking just requires occasional washing with soap and water, but the gaps between boards should still stay clear so water can drain.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (657) 306-5177